Dry-stack brickwork for woodstove continues
RichC | December 7, 2015
After fastening aluminum angle to the floor and leveling the corner with sand, I packed and filled the base with brick to continue adding our old catalytic woodstove to the shop. Then it was time to start the dry-stack walls … until I ran out of spare brick. Thankfully the brick is available so should be […]