Stretched out another weekend to work on the condo kitchen

Posted By on July 5, 2018

RichCTileBathroom180703Condo1718KitchenTile180629

Well finishing the kitchen upgrade at the condo was my goal, but since Brenda was with me, more than the condo kitchen was worked on! The guest bathroom’s minor vanity update grew into a MUCH larger project. One thing lead to another and before I knew it, my wife had me doing more tile than the kitchen backsplash (what I had planned!)

Condo1718KitchenBevelTile180630

So now, the kitchen is finished (almost) but the bathroom a mess of ungrouted tile, missing vanity and toilet and a debate over a shower door that nearly lead to one of us walking out! She wants a very expensive heavy roller door requiring a Hulk to lift, special order and extra support since the heavy glass "hangs" from a rod. I would have preferred spending fewer dollars and installing a medium weight/thickness door that was instock at a Home Depot or Lowes. I’m still not sure I "alone" can install such a heavy door? Suffice to say, we stopped talking about it and I at least did the support so "if we go that way" it can be installed — maybe by an installer???

RichCProfileTileDust180703Condo1718BrendaBath180629

Comments

Desultory - des-uhl-tawr-ee, -tohr-ee

  1. lacking in consistency, constancy, or visible order, disconnected; fitful: desultory conversation.
  2. digressing from or unconnected with the main subject; random: a desultory remark.
My Desultory Blog